D
darkenfast
Guest
I've been thinking...and that usually gets me in trouble! As I remember from waaay back, the Apollo CM weighed about 11 klbs (roughly). The SM weighed in at over 50 klb. Now, the CEV is quite a bit larger than the CM, and I would assume that even with improvements in how we build spacecraft, it's still going to weigh at least 50% more than the CM. So, if the payload capacity of the CLV is around 25 tonnes (55klbs, again roughly), the back end (Service Module?) is going to have to come in a lot lighter than the Apollo SM. Which I can see for LEO, with less requirement for fuel/oxidizer, and of course no fuel cells. But, when it comes times for the lunar mission, there's a problem. Even with more energetic fuels, how is the SM going to have enough "juice" to handle LOI (with a much bigger Lander) and TEI? The only way I can figure it, is that either the EDS or the Lander has to provide LOI services. The Lander does seem to have a lot of tankage in its Descent Stage (I realize that's a notional drawing). Or, am I just missing something?