Remaining Shuttle Schedule

Status
Not open for further replies.
M

MeteorWayne

Guest
<p>NASA has officially listsed the target dates for the remaining shuttle missions.</p><ul><li><strong>Oct. 8, 2008:</strong> STS-125 on Atlantis will be the final servicing mission to the Hubble Space Telescope, bringing up new observing instruments, batteries, gyroscopes and other equipment that should tide Hubble over until 2013.<br /><br /></li><li><strong>Nov. 10, 2008:</strong> STS-126 on Endeavour is aimed at resupplying the space station and fixing balky joints on the station's solar arrays.<br /><br /></li><li><strong>Feb. 12, 2009:</strong> STS-119 on Discovery will deliver the final pair of U.S. solar arrays to the space station.<br /><br /></li><li><strong>May 15, 2009:</strong> STS-127 on Endeavour will&nbsp;carry up the external experiment platform for Japan's Kibo laboratory, as well as spare parts for the space station.&nbsp;<br /><br /></li><li><strong>July 30, 2009:</strong> STS-128 on Atlantis will bring a logistics module crammed with experiments and supplies&nbsp;to the station. An experiment on the station's hull will be switched out, and an empty ammonia tank assembly will be returned to Earth.<br /><br /></li><li><strong>Oct. 15, 2009:</strong> STS-129 on Discovery will focus on placing spare components on the station's exterior, including extra gyroscopes, supply tanks, pump modules and robot parts.<br /><br /></li><li><strong>Dec. 10, 2009:</strong> STS-130 on Endeavour will deliver Node 3, the station's last connecting node, as well as&nbsp;a robotic control station and&nbsp;observation post called the Cupola.<br /><br /></li><li><strong>Feb. 11, 2010:</strong> STS-131 on Atlantis will bring up yet another load of experiments in a logistics module. Spacewalkers will attach a spare ammonia tank assembly and bring back a European experiment that was mounted on the outside of the Columbus lab.<br /><br /></li><li><strong>April 8, 2010:</strong> STS-132 on Discovery will bring up a cargo carrier with spare parts and other hardware for the space station. A Russian-built research lab will be attached to the station's Zarya cargo module.<br /><br /></li><li><strong>May 31, 2010:</strong> STS-133 on Endeavour will bring up spare components for storage on the station's exterior, including communication antennas, debris shields, a high pressure gas tank and spare parts for the Dextre robot.</li></ul><p>Note that this does not include the 1 more mission demanded but not funded by congess. Well they funded it, but for maybe 10% of what it would cost.</p><p>Link:&nbsp; http://cosmiclog.msnbc.msn.com/archive/2008/07/08/1187609.aspx</p> <div class="Discussion_UserSignature"> <p><font color="#000080"><em><font color="#000000">But the Krell forgot one thing John. Monsters. Monsters from the Id.</font></em> </font></p><p><font color="#000080">I really, really, really, really miss the "first unread post" function</font><font color="#000080"> </font></p> </div>
 
Z

Zipi

Guest
&nbsp; 1. NASA SETS LAUNCH DATES FOR REMAINING SPACE SHUTTLE MISSIONS<br /><br />----------------------------------------------------------------------<br /><br />Date:&nbsp;&nbsp;&nbsp; Mon, 7 Jul 2008 16:42:03 -0500<br />From:&nbsp;&nbsp;&nbsp; info@JSC.NASA.GOV<br />Subject: NASA SETS LAUNCH DATES FOR REMAINING SPACE SHUTTLE MISSIONS<br /><br />July 7, 2008<br /><br />Kyle Herring<br />Johnson Space Center, Houston<br />281-483-5111<br /><br /><br />John Yembrick<br />Headquarters, Washington<br />202-358-0602<br /><br /><br /><br />Report #H08-167<br /><br />NASA SETS LAUNCH DATES FOR REMAINING SPACE SHUTTLE MISSIONS<br /><br />HOUSTON -- Following a detailed, integrated assessment, NASA selected target launch dates for the remaining eight space shuttle missions on the current manifest in 2009 and 2010. The manifest includes one flight to the Hubble Space Telescope, seven assembly flights to the International Space Station, and two station contingency flights, planned to be completed before the end of fiscal year 2010. The agency previously selected Oct. 8 and Nov. 10 as launch dates for Atlantis' STS-125 mission to service Hubble and Endeavour's STS-126 / ULF-2 mission to supply the space station and service both Solar Alpha Rotary Joints on the port and starboard end of its truss backbone that supports equipment and solar arrays.<br /><br />The approved target dates are subject to change based on processing and other launch vehicle schedules. They reflect the agency's commitment to complete assembly of the station and to retire the shuttle fleet as transition continues to the new launch vehicles, including Ares and Orion.<br /><br />SHUTTLE FLIGHTS IN 2009<br /><br />Feb. 12 -- Discovery (STS-119 / 15A) will kick off a five-flight 2009 with its 36th mission to deliver the final pair of U.S. solar arrays to be installed on the starboard end of the station's truss. The truss serves as the backbone support for external equipment and spare components, including the Mobile Base System. Lee Archambault will command the 14-day flight that will include four planned spacewalks. Joining him will be pilot Tony Antonelli and mission specialists John Phillips, Steve Swanson, Joseph Acaba, Richard Arnold and Japan Aerospace Exploration Agency astronaut Koichi Wakata. Wakata will replace Sandy Magnus on the station as a flight engineer. STS-119 marks the 28th shuttle flight to the station. <br /><br />May 15 -- Endeavour (STS-127 / 2JA) sets sail on its 23rd mission with the Japanese Kibo Laboratory's Exposed Facility and Experiment Logistics Module Exposed Section, the final permanent components of the Japan Aerospace Exploration Agency's contribution to the station program. During the 15-day mission, Endeavour's crew will perform five spacewalks and deliver six new batteries for the P6 truss, a spare drive unit for the Mobile Transporter and a spare boom assembly for the Ku-band antenna. Mark Polansky will be Endeavour's commander with Doug Hurley as pilot. Mission specialists will be Christopher Cassidy, Tom Marshburn, Dave Wolf, Tim Kopra and Canadian Space Agency astronaut Julie Payette. Kopra will become a station flight engineer replacing Koichi Wakata, who will return home with the STS-127 crew. It will be the 29th shuttle flight to the station.<br /><br />July 30 -- Atlantis (STS-128 / 17A) launches on its 31st flight, an 11-day mission carrying science and storage racks to the station. In the payload bay will be a Multi-Purpose Logistics Module holding science and storage racks. Three spacewalks are planned to remove and replace a materials processing experiment outside the European Space Agency's Columbus module and return an empty ammonia tank assembly. The mission includes the rotation of astronaut Nicole Stott for Tim Kopra, who will return to Earth with the shuttle crew. The remaining crew members have yet to be named. STS-128 marks the 30th shuttle flight dedicated to station assembly and outfitting. <br /><br />Oct. 15 -- Discovery's (STS-129 / ULF-3) 37th mission will focus on staging spare components outside the station. The 15-day flight includes at least three spacewalks. The payload bay will carry two large External Logistics Carriers holding two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly, a spare latching end effector for the station's robotic arm, a spare trailing umbilical system for the Mobile Transporter and a high-pressure gas tank. Canadian Space Agency astronaut Bob Thirsk will return home aboard Discovery with its crew, which has yet to be named. STS-129 marks the 31st shuttle mission devoted to station assembly.<br /><br />Dec. 10 -- Endeavour (STS-130 / 20A) will close 2009 with its 24th mission to deliver the final connecting node, Node 3, and the Cupola, a robotic control station with six windows around its sides and another in the center that provides a 360-degree view around the station. At least three spacewalks are planned during the 11-day mission. The 32nd station assembly mission by a shuttle does not yet have a crew named.<br /><br />SHUTTLE FLIGHTS IN 2010<br /><br />Feb. 11 -- Atlantis (STS-131 / 19A) begins its 32nd mission as the first flight in 2010, carrying a Multi-Purpose Logistics Module filled with science racks that will be transferred to laboratories of the station. The 11-day mission will include at least three spacewalks to attach a spare ammonia tank assembly outside the station and return a European experiment that has been outside the Columbus module. It will be the 33rd shuttle mission to the station. The crew has yet to be named.<br /><br />April 8 -- Discovery's (STS-132 / ULF-4) 38th mission will carry an integrated cargo carrier to deliver maintenance and assembly hardware, including spare parts for space station systems. In addition, the second in a series of new pressurized components for Russia, a Mini Research Module, will be permanently attached to the bottom port of the Zarya module. The Russian module also will carry U.S. pressurized cargo. The first Russian Mini Research Module to go to the station is scheduled to launch on a Russian rocket in the summer of 2009.<br /><br />Additionally, at least three spacewalks are planned to stage spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight. The laboratory module is scheduled for launch on a Russian rocket in 2011. The mission marks the 34th mission to the station. The STS-132 crew has yet to be named. <br /><br />May 31 -- Endeavour's (STS-133 / ULF-5) 25th mission will carry critical spare components that will be placed on the outside of the station. Those will include two S-band communications antennas, a high-pressure gas tank, additional spare parts for Dextre and micrometeoroid debris shields. At least three spacewalks are planned to be carried out by the crew, which has yet to be named. The 15-day mission will be the 35th to the station. <div class="Discussion_UserSignature"> </div>
 
T

trailrider

Guest
<p><BR/>Replying to:<BR/><DIV CLASS='Discussion_PostQuote'>&nbsp; 1. NASA SETS LAUNCH DATES FOR REMAINING SPACE SHUTTLE MISSIONS----------------------------------------------------------------------Date:&nbsp;&nbsp;&nbsp; Mon, 7 Jul 2008 16:42:03 -0500From:&nbsp;&nbsp;&nbsp; info@JSC.NASA.GOVSubject: NASA SETS LAUNCH DATES FOR REMAINING SPACE SHUTTLE MISSIONSJuly 7, 2008Kyle HerringJohnson Space Center, Houston281-483-5111John YembrickHeadquarters, Washington202-358-0602Report #H08-167NASA SETS LAUNCH DATES FOR REMAINING SPACE SHUTTLE MISSIONSHOUSTON -- Following a detailed, integrated assessment, NASA selected target launch dates for the remaining eight space shuttle missions on the current manifest in 2009 and 2010. The manifest includes one flight to the Hubble Space Telescope, seven assembly flights to the International Space Station, and two station contingency flights, planned to be completed before the end of fiscal year 2010. The agency previously selected Oct. 8 and Nov. 10 as launch dates for Atlantis' STS-125 mission to service Hubble and Endeavour's STS-126 / ULF-2 mission to supply the space station and service both Solar Alpha Rotary Joints on the port and starboard end of its truss backbone that supports equipment and solar arrays.The approved target dates are subject to change based on processing and other launch vehicle schedules. They reflect the agency's commitment to complete assembly of the station and to retire the shuttle fleet as transition continues to the new launch vehicles, including Ares and Orion.SHUTTLE FLIGHTS IN 2009Feb. 12 -- Discovery (STS-119 / 15A) will kick off a five-flight 2009 with its 36th mission to deliver the final pair of U.S. solar arrays to be installed on the starboard end of the station's truss. The truss serves as the backbone support for external equipment and spare components, including the Mobile Base System. Lee Archambault will command the 14-day flight that will include four planned spacewalks. Joining him will be pilot Tony Antonelli and mission specialists John Phillips, Steve Swanson, Joseph Acaba, Richard Arnold and Japan Aerospace Exploration Agency astronaut Koichi Wakata. Wakata will replace Sandy Magnus on the station as a flight engineer. STS-119 marks the 28th shuttle flight to the station. May 15 -- Endeavour (STS-127 / 2JA) sets sail on its 23rd mission with the Japanese Kibo Laboratory's Exposed Facility and Experiment Logistics Module Exposed Section, the final permanent components of the Japan Aerospace Exploration Agency's contribution to the station program. During the 15-day mission, Endeavour's crew will perform five spacewalks and deliver six new batteries for the P6 truss, a spare drive unit for the Mobile Transporter and a spare boom assembly for the Ku-band antenna. Mark Polansky will be Endeavour's commander with Doug Hurley as pilot. Mission specialists will be Christopher Cassidy, Tom Marshburn, Dave Wolf, Tim Kopra and Canadian Space Agency astronaut Julie Payette. Kopra will become a station flight engineer replacing Koichi Wakata, who will return home with the STS-127 crew. It will be the 29th shuttle flight to the station.July 30 -- Atlantis (STS-128 / 17A) launches on its 31st flight, an 11-day mission carrying science and storage racks to the station. In the payload bay will be a Multi-Purpose Logistics Module holding science and storage racks. Three spacewalks are planned to remove and replace a materials processing experiment outside the European Space Agency's Columbus module and return an empty ammonia tank assembly. The mission includes the rotation of astronaut Nicole Stott for Tim Kopra, who will return to Earth with the shuttle crew. The remaining crew members have yet to be named. STS-128 marks the 30th shuttle flight dedicated to station assembly and outfitting. Oct. 15 -- Discovery's (STS-129 / ULF-3) 37th mission will focus on staging spare components outside the station. The 15-day flight includes at least three spacewalks. The payload bay will carry two large External Logistics Carriers holding two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly, a spare latching end effector for the station's robotic arm, a spare trailing umbilical system for the Mobile Transporter and a high-pressure gas tank. Canadian Space Agency astronaut Bob Thirsk will return home aboard Discovery with its crew, which has yet to be named. STS-129 marks the 31st shuttle mission devoted to station assembly.Dec. 10 -- Endeavour (STS-130 / 20A) will close 2009 with its 24th mission to deliver the final connecting node, Node 3, and the Cupola, a robotic control station with six windows around its sides and another in the center that provides a 360-degree view around the station. At least three spacewalks are planned during the 11-day mission. The 32nd station assembly mission by a shuttle does not yet have a crew named.SHUTTLE FLIGHTS IN 2010Feb. 11 -- Atlantis (STS-131 / 19A) begins its 32nd mission as the first flight in 2010, carrying a Multi-Purpose Logistics Module filled with science racks that will be transferred to laboratories of the station. The 11-day mission will include at least three spacewalks to attach a spare ammonia tank assembly outside the station and return a European experiment that has been outside the Columbus module. It will be the 33rd shuttle mission to the station. The crew has yet to be named.April 8 -- Discovery's (STS-132 / ULF-4) 38th mission will carry an integrated cargo carrier to deliver maintenance and assembly hardware, including spare parts for space station systems. In addition, the second in a series of new pressurized components for Russia, a Mini Research Module, will be permanently attached to the bottom port of the Zarya module. The Russian module also will carry U.S. pressurized cargo. The first Russian Mini Research Module to go to the station is scheduled to launch on a Russian rocket in the summer of 2009.Additionally, at least three spacewalks are planned to stage spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight. The laboratory module is scheduled for launch on a Russian rocket in 2011. The mission marks the 34th mission to the station. The STS-132 crew has yet to be named. May 31 -- Endeavour's (STS-133 / ULF-5) 25th mission will carry critical spare components that will be placed on the outside of the station. Those will include two S-band communications antennas, a high-pressure gas tank, additional spare parts for Dextre and micrometeoroid debris shields. At least three spacewalks are planned to be carried out by the crew, which has yet to be named. The 15-day mission will be the 35th to the station. <br />Posted by Zipi</DIV></p><p>If you think this schedule will hold, I've got a bridge over the Banana and Indian Rivers I'll sell you!&nbsp; Note that the last flight is scheduled for May 2010, but the program can go as far as September...according to current planning.&nbsp; But we have no idea what the next President, regardless of which one it is, will do (to) the manned space program.&nbsp; Or what Congress will do, pro or con.</p><p>Ares I is so marginal that I have to question whether it will every fly.&nbsp; While Direct 2.0 was panned by NASA MSFC in October, who's to say whether the current NASA headquarters will be the same after January 20, 2009?&nbsp; Ares V-point- whatever-the-latest-iteration-is, is so far removed from the original design that, like a great many programs before, it could wind up cancelled.&nbsp; What would replace it, I don't know.&nbsp; We are just going to have to wait and see.</p><p>Ad Luna! Ad Ares! Ad Astra!&nbsp;<br /></p>
 
Status
Not open for further replies.

Latest posts