E
EarthlingX
Guest
NASA Web site":3d9cgx7d said:Final Spacewalk of STS-130 Continues
Wed, 17 Feb 2010 03:32:54 AM GMT
Mission Specialists Nicholas Patrick and Robert Behnken are conducting the mission’s third and final spacewalk.
The ammonia loops are open. With the cupola now located on its permanent home on Tranquility’s Earth facing port and the Pressurized Mating Adapter 3 on the end of the node, Patrick and Behnken are free to begin getting them into the right configuration. Patrick is connecting the mating adapter’s heater and data cables to Tranquility. Then he will work with Behnken to remove six panels of insulation over the cupola’s windows.
Once the insulation is out of the way, Patrick will be able release the three bolts on each of the seven window’s covers; those bolts held the covers in place during Endeavour’s launch. While he does so, Behnken will get back to outfitting Tranquility by installing four worksite interfaces and five more handrails.
STS-130-08:17:03:00 ..
on internal power, spacewalk started ..
..
..
STS-130-08:17:19:00 ..
.. both outside ..
..
..
STS-130-08:17:25:00 ..
.. internal work on Cupola continues ...
..
STS-130-08:17:54:00 ..
.. over Poland, astronauts saying 'hi' to the cloudy Poland ..
..
..
STS-130-08:18:05:00 ..
.. ammonia lines complete, next are power lines ..
..
..
STS-130-08:18:08:00 ..
.. heater and data cables connected ..
..
..
STS-130-08:18:28:00 ..
..
over Australia ..
..
..
STS-130-08:18:31:00 ..
..
beginning to remove cover from Cupola ..
..
..
STS-130-08:18:56:00 ..
..
.. first part of insulation getting into bag ..
..
..
STS-130-08:19:01:00 ..
..
ahead of a schedule, next 5 min break ..
..
..
STS-130-08:19:07:00 ..
..
.. break over, they were taking photos ..
..
..
STS-130-08:19:26:00 ..
..
cover removed, sunrise over London ..
..
..
STS-130-08:19:29:00 ..
..
.. removing launch locks on the window shutters ..
.. will take about 40 min ..
..
..
STS-130-08:19:58:00 ..
..
.. final bolts, one more to go ..