From
spaceflightnow <br /><br />"Tani, Expedition 16 commander Peggy Whitson and Russian flight engineer Yuri Malenchenko ran into problems earlier today with circuit breaker trips that briefly prevented flight controllers from changing the orientation of a right-side solar panel as required for the shuttle's docking next week. <br /><br />The trouble involved one of the two wings making up the starboard 4, or S4, array on the right side of the station's main power truss. Those arrays currently are prevented from rotating to track the sun by earlier trouble with a massive rotary joint. <br /><br />Concern about the solar alpha rotary joint, or SARJ, is behind a push to add a fourth spacewalk to Atlantis' mission. Engineers want a detailed inspection to help them figure out what might be wrong and what might be needed to fix it. <br /><br />While unable to rotate paddle-wheel style, the two S4 solar wings also can be turned about their long axis, much like changing the pitch of an airplane propeller, to maximize electrical output. Early today, however, one or more remote power control modules, which act like circuit breakers, tripped open and stalled the so-called beta gimbal joint used to turn the S4-1A array. <br /><br />It's not yet clear what might have caused the circuit breaker trips, but engineers were able to develop a work-around that enabled them to turn the array as required. They also sent commands to reposition the contaminated right-side SARJ to improve electricity generation. <br /><br />The circuit breaker trips are not expected to have any impact on the Atlantis mission. "<br /><br /> <div class="Discussion_UserSignature"> <p><font color="#000080"><em><font color="#000000">But the Krell forgot one thing John. Monsters. Monsters from the Id.</font></em> </font></p><p><font color="#000080">I really, really, really, really miss the "first unread post" function</font><font color="#000080"> </font></p> </div>